Articles follow the sequence of prefabrication, from the component to the finished assembly.
Components
Component manufacturing
How wall panels, floor cassettes, and roof modules are fabricated under controlled factory conditions, and what quality checks apply before they leave the plant.
Logistics
Transport and staging
How finished modules are sequenced, loaded, moved, and staged on site so that assembly can proceed in the order the design requires.
Assembly
On-site assembly
How crews connect prefabricated components, align structural joints, and coordinate crane work with the factory schedule.
Sequence
The prefabrication sequence
01
Factory planning
Design drawings are converted into fabrication instructions, and component schedules are set against site delivery dates.
02
Transport coordination
Modules are sized, packed, and routed so they arrive at the site in the sequence the crane team needs.
03
Crane erection
Components are lifted into position, aligned, and fixed, with each connection checked before the next module is placed.